Pre-Insulated PIR Ductwork for HVAC Projects

Aluminum-faced polyisocyanurate panels combine the duct wall and insulation in one board. Compare the complete installed scope with galvanized ductwork and separate insulation before choosing a construction for your project.

We supply PIR panels, joining profiles, sealing materials and fabrication tools. Send your drawings so we can review the materials required for the specified runs.

Installed rectangular pre-insulated ducts around structural beams

PIR vs. Insulated Galvanized Ductwork

Compare the cost of the completed duct run, including fabrication, supports, insulation and testing. Use the same route, air service and acceptance criteria for both options.

Cost or Design Item PIR Pre-Insulated Duct Galvanized Steel With Separate Insulation
Materials and fittings Allow for faced boards, offcuts, profiles, adhesive, tape, reinforcement and transitions as specified. Allow for steel duct and fittings, connectors, insulation, insulation fixings and the specified outer facing or jacket.
Labor and sequence Price cutting, folding, joining, hanging and site connections. The duct wall already incorporates insulation. Price metal fabrication and installation, plus application and finishing of the separate insulation layer.
Handling and supports Calculate installed weight with profiles and reinforcement. Check section lengths against the access route and support details. Calculate installed weight with the specified steel gauge, insulation, stiffeners and connections. Allow for lifting and access.
Thermal and leakage checks Review insulation continuity at seams, supports and transitions. Price the specified leakage test for the assembled run. Review insulation continuity at fittings and hangers. Include sealing and testing to the same leakage criterion.

Show labor and site access allowances for each option. If the installation sequence affects the project schedule, record the impact separately from the material price.

What Goes Into a PIR Duct Package?

UNTDuct aluminum-faced PIR duct panel

PIR Core Panels

Match the specified core, facing and thickness to each run. Confirm usable sheet dimensions before nesting the cut pieces.

Browse PIR duct panels

UNTDuct aluminum invisible joining profile

Joining Profiles

Identify duct-to-duct joints, equipment flanges and transition details. Count profile lengths and connection parts by joint type.

View duct joining profiles

UNTDuct aluminum foil sealing tape

Adhesive and Sealing Materials

List the adhesive, foil tape and other sealing materials specified for the panel seams and connection details.

View aluminum foil tape

UNTDuct manual cutters and tools for pre-insulated duct fabrication

Fabrication Tools

Match cutters and blades to the selected board and the cuts your team will make in the shop or on site.

View the manual tool kit

Check the Specified Duct Construction

Thermal Performance

Review thermal conductivity and thickness for the selected board. Where cold ducts pass through humid spaces, check condensation risk and insulation continuity at joints and transitions.

Fire and Smoke Documentation

Match the test method and specimen to the construction proposed. For a run requiring a fire-resistance rating, check the evidence covering the duct assembly, joints and supports.

View certificates and test reports

Installation Access

Check beam clearances and delivery openings using the outside duct dimensions, including the joint and support space. Decide where to split long sections before releasing the cut list.

Airside Finish and Acoustics

Confirm facing, exposed-edge treatment and access for cleaning where specified. Check the acoustic design separately, including air velocity, fittings and any required attenuation.

Technical Specifications for 20 mm PIR ALU Board

Use these values for the listed PIR ALU configuration when reviewing the board submittal. Confirm project design pressure, reinforcement and leakage criteria against the proposed assembly and joint details.

Parameter Listed PIR ALU Configuration
Panel construction Aluminum facing / PIR foam / aluminum facing
Listed board size 3,950 × 1,200 × 20 mm
Aluminum foil thickness 0.06 mm (60 μm)
Thermal conductivity 0.022 W/(m·K)
Compressive strength 0.2 MPa

View the PIR ALU product specification · Review certificates and test reports

From a Duct Drawing to a Material Takeoff

Consider a supply run with four fabricated sections between an air-handling unit and an existing duct. Start with the approved section drawings and keep the two end connections separate from the intermediate joints.

Four Fabricated Sections

Nest the panel blanks on the confirmed usable sheet size. Include the developed dimensions for any offsets or transitions and the required trimming allowance before counting sheets.

Three Intermediate Joints

Four sections in sequence create three joints between sections. Measure each joint using its approved profile detail and add the sealing materials called for at that joint.

Two End Connections

Measure the air-handling unit outlet and the retained duct opening. Schedule the adapters, flanges or transitions separately so they can be checked against both interfaces.

Send Your Duct Schedule for a System Review

Whether you are comparing constructions or preparing a purchase order, send us the drawing revision and quantity schedule. We can review the proposed panel, profile and tool scope and identify available product documents.

What to Send

  • Duct layout, service, sizes and design pressure by run
  • Specified panel, leakage criteria and joint details
  • Equipment connections and shop or site fabrication scope
  • Estimated quantities, required reports and delivery phases

Fabricate, Assemble and Verify

Marking a pre-insulated panel for duct fabrication

1. Mark and Cut

Transfer the approved dimensions to the board and check the cut layout before making straight cuts and grooves.

Folding a cut panel into a rectangular duct section

2. Bond and Fold

Use the approved adhesive and assemble the section to the specified shape. Verify dimensions and alignment before joining sections.

Fitting a joining profile to a pre-insulated duct section

3. Fit Profiles and Seal

Fit the specified profiles and treat seams, corners and transitions according to the approved joint details.

Installed pre-insulated ductwork in Australia

4. Install and Verify

Check supports, interfaces and access after installation. Verify the completed run against the project inspection and leakage-test requirements.

View the fabrication sequence · Browse fabrication tools

Ductwork Installation References

UNTDuct pre-insulated ductwork installation in Panama

Panama

The installation shows adjacent rectangular ducts with visible cross-joints and a change in direction close to the ceiling. For a similar layout, measure the clearances around the offset and list the fitting and its connections separately in the material takeoff.

UNTDuct pre-insulated ductwork installation in Thailand

Thailand

A long overhead duct run passes beneath structural beams, with scaffolding visible along the work area. For a similar route, check the available lifting space and beam clearance before setting fabricated section lengths and joint locations.

Review Requirements by Application

PIR Duct System FAQs

How do I choose between PIR, PU and phenolic duct panels?

Start with the constructions permitted by the specification. Compare insulation performance at the proposed thickness, facing, joint details and product-specific test documentation. Include fabrication and installation in the comparison.

Can PIR ductwork be installed outdoors?

Send the outdoor exposure conditions and specified construction before ordering. Confirm weather and ultraviolet protection, corrosion exposure, joint protection and support details with the project engineer.

How can I compare the installed cost of PIR and galvanized ductwork?

Use the same route and acceptance criteria for both quotes. Include material utilization, fittings, supports, labor, access, insulation work and testing. Show schedule savings separately where you have a documented basis.

Which tools and consumables should I order for site fabrication?

List the cuts, folds and joints your team will make on site. Match cutters and blades to the board thickness and required groove geometry, then list the specified adhesive, tape, profiles and connection parts.

Can a panel fire test establish the fire-resistance rating of a duct run?

The panel report covers the test method and specimen stated in that report. A duct fire-resistance rating requires evidence for the specified assembly, including its joint and support details.

Can I request a preliminary quote before the takeoff is complete?

Yes. Send the latest drawings, provisional quantities and the specification items still open. We can review the proposed supply scope and identify the details needed for a firm quotation.

Request a PIR Duct System Quote

Tell us the project location and which runs you want to price. Send drawings or the bill of materials to inquiry@untduct.com and include the project name in both messages.

 
Contact us if have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!