Match Your Ductwork to the Project Fire Specification

We supply phenolic and PIR pre-insulated duct panels, joining profiles and fabrication accessories. Send us the fire specification and duct schedule so we can identify available product reports and check which configurations match the requested scope.

Rectangular pre-insulated ductwork installed around structural beams

Reaction to Fire and Fire Resistance

Reaction to Fire: The Tested Product

Reaction-to-fire tests assess how a product contributes to fire under specified conditions. Depending on the method, reported results can cover flame spread, smoke production or flaming droplets. Match the result to the proposed board, thickness and facing.

Fire Resistance: The Duct Assembly

A time-based fire-resistance classification applies to a duct assembly within the documented scope. Check the permitted sizes, orientation, joints, supports and penetration details. Review smoke extract and kitchen grease exhaust against their own project requirements.

Fire Standards and Submittal Evidence

Use the standard, edition and acceptance criteria named in the tender. Ask for the document that covers the product or assembly you intend to submit.

Published test documents include BS 476, GB 8624 and AS/NZS 1530.3. Contact us to confirm report coverage for your proposed product.

Standard What It Evaluates What to Check
BS 476 Parts 6 & 7 Fire propagation and surface spread of flame, respectively. For a Class 0 specification, confirm the applicable criteria and reports for the proposed product.
ASTM E84 / UL 723 Surface flame spread and smoke developed under the test conditions. Compare the measured FSI and SDI with the limits specified for the intended use.
EN 13501-1 Reaction-to-fire classification, with smoke and flaming-droplet subclasses where applicable. If B-s1,d0 is specified, ask for the classification report and relevant end-use conditions.
AS/NZS 1530.3 Ignitability, flame propagation, heat release and smoke release indices. Check all required indices and the product construction identified in the report.
UL 181 Requirements for factory-made air ducts and air connectors. Where a listing is required, verify the listed product and intended use.
EN 1366-1 / EN 13501-3 Fire-resistance testing and classification of ventilation duct assemblies, respectively. Verify the required classification, orientation, assembly details and field of application.

View UNTDuct certificates and published test documents

Phenolic and PIR Panel Options

UNTDuct aluminum-faced phenolic foam duct panel

Phenolic Pre-Insulated Duct Panels

Start here when the specification calls for a phenolic core. Our aluminum-faced phenolic panel is a candidate for the submittal once its facing, board thickness and required test evidence are confirmed.

UNTDuct pre-insulated PIR duct panel

PIR Pre-Insulated Duct Panels

Consider our aluminum-faced PIR options where the specification permits PIR. Identify the exact board and request the test results needed for its intended service before proposing it as an alternative.

Joining profile being fitted to a pre-insulated duct section

Check the Details That Can Change the Submittal

  • Facing and thickness. Match the proposed board, coating and thickness to the document.
  • Smoke and halogens. If the specification includes low smoke zero halogen (LSZH) or toxicity limits, request separate evidence for the specified test methods.
  • Joints and accessories. Identify the profile, tape, sealant and reinforcement in the proposed detail. Check each substitution against the applicable report scope.
  • Supports and penetrations. For a rated run, confirm the documented construction and coordinate wall or floor crossings and damper interfaces with the project engineer.

Separate Duct Runs Before Requesting a Quote

On a hospital tender, a single duct schedule may contain three different scopes. Separate them in the takeoff so each run can be priced against the correct requirements.

Ward Supply and Return

Where the specification calls for a panel fire-performance result, list the required test, thickness, facing and quantities for the approved material options.

Fire-Resisting Ventilation Runs

Where an assembly classification is specified, separate these runs by required duration and orientation. Hold the assembly price until a construction with matching evidence is identified.

Dedicated Smoke Extract

List the smoke extract runs separately. Confirm the specified smoke-control standard and system classification before selecting the construction or pricing the interfaces.

Send Your Duct Schedule and Fire Specification

Share the tender clause and marked-up drawings. We can identify available product documentation and clarify the material and accessory scope for your submittal.

Include These Project Details

  • Project location, governing standard and edition
  • Duct service, required class or duration, and drawing revision
  • Proposed board, dimensions, orientation and connection details
  • Required reports, quantities and submittal deadline

Review Requirements by Application

Healthcare & Hospitals

Separate general ventilation, fire-resisting runs and dedicated exhaust by service.

Commercial HVAC

Identify duct runs that cross fire compartments and check constraints above ceilings.

Cleanroom, Pharma & Food

Check airside finishes and cleaning conditions alongside the specified fire criteria.

Fire-Rated Ductwork FAQs

Should I specify phenolic or PIR for my project?

Start with the core materials allowed by the specification. Compare product-specific reports, facing and thickness, then check the assembly evidence if a time-based duct classification is required.

How do Class 0 and ASTM E84 Class A differ?

Class 0 refers to a classification used in certain specifications with BS 476 criteria. ASTM E84 provides flame-spread and smoke-developed indices used by codes or specifications to assign a class for a given application. Confirm the required method and limits with the project team.

Does Class 0 give a duct a 60-minute rating?

A 60-minute duct rating requires evidence for the specified assembly, including the relevant orientation and installation details. Class 0 covers a different criterion.

Can I use these panels for smoke extract or kitchen grease exhaust?

Ask the project engineer to confirm the permitted system and applicable evidence for each service. Supply and return duct panel reports cover the specimens identified in those reports. Dedicated exhaust requires evidence appropriate to the intended system.

Can you provide third-party reports for a project submittal?

Send the test standard, required classification and proposed board details. We can confirm which reports are available for the requested product and identify any documentation gaps before you submit.

Request Fire Test Reports and Submittal Documents

Use the form to tell us the project name, duct service and required tests. Email drawings, the duct schedule or tender clauses to inquiry@untduct.com with the project name in the subject.

 
Contact us if have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!