Pre-Insulated Ductwork for Controlled Production Areas
Cleanroom supply air, pharmaceutical production zones and food washdown areas place different demands on duct surfaces, joints and insulation. Start with the room schedule and the service of each duct run before selecting a panel.
We supply PIR duct panels, connection profiles and fabrication tools for runs where the project specification permits pre-insulated construction.
Discuss Your Ductwork Specification
Define the Duct Scope by Production Zone
Cleanrooms
Match supply and return runs to the room schedule. Record the duct construction, leakage test scope and the connection to terminal filter housings where specified. Mark how those connections will be accessed after installation.
Pharmaceutical Production
Identify where the project calls for a particular airside finish, cleaning procedure or material traceability. Keep any dedicated process exhaust on separate schedule lines and confirm its permitted construction with the project engineer.
Food Processing and Packaging
Separate dry packaging areas from wet processing and washdown zones. For runs near exposed product, check the facility's condensate controls and document any moisture, cleaning chemical or spray exposure.
Specify Both Faces of the Duct
Airside Surface
State the required facing and how cut edges, seams and penetrations are to be finished. If cleaning is specified, share the method and agents for review against the facing and joint materials.
Exposed Surface
Mark sections exposed to humid voids, cleaning spray or chemicals. Include supply-air temperature and surrounding temperature and humidity where condensation is a concern.
Connections and Access
Send flange dimensions, access locations and the specified joint detail. Record design pressure and leakage criteria by duct service for the assembly under review.
Match the Specification to the Duct Package
AluPIR Duct Foam Board
Where aluminum-faced PIR is specified, confirm the required facing and panel thickness before calculating sheet quantities.
Profiles and Edge Details
Use the approved joint drawings to count profiles and identify equipment adapters or transitions that need separate lines.
Fabrication Tools
Identify which sections your team will cut and assemble on site. Confirm the tools against those operations and the selected panel construction.
Review the Material Schedule Before Ordering
Send us the marked-up duct schedule. We can review the proposed panel and profile quantities for the specified runs and identify the product documents available for your submittal.
Send Your Duct ScheduleWhat to Include
- Zone layout, duct services and quantities by run
- Approved facing, thickness, joint and connection details
- Cleaning method and exposure conditions for affected runs
- Required reports, test criteria and delivery phases
Example: Dry Packing Next to a Washdown Room
List the supply runs serving dry packing separately from runs in or above the washdown area. For the dry area, check the specified facing and terminal connections. For the wet area, give the design team the ambient conditions, cleaning method and exposure details to review duct construction and condensation control.
When the construction is confirmed, list panel quantities and profiles by run. Record any unsupported or unapproved scope separately for review before releasing the order.

Check the Evidence for the Specified Construction
Match each requested report to the relevant panel, facing or assembled joint. An antimicrobial test describes the tested surface and conditions. Room cleanliness classification is based on airborne particle concentration in the cleanroom or clean zone.
Cleanroom, Pharma and Food Ductwork FAQs
Does ISO 14644-1 assign a cleanliness class to duct panels?
ISO 14644-1 classifies air cleanliness in cleanrooms and clean zones by airborne particle concentration. Use the room target and duct specification together when preparing the material submittal.
How should we specify ductwork for sterile pharmaceutical areas?
Send the project-approved duct specification, including facing, joint details and required evidence. Where EU GMP Annex 1 applies, confirm how the duct runs fit the facility's design and qualification requirements with the project team.
Can we use the same panel in dry packing and washdown areas?
Review the runs separately. For washdown exposure, provide the cleaning agents, method, frequency and expected spray or moisture exposure so the proposed facing and joints can be assessed.
What information helps assess condensation risk above a food line?
Share the supply-air temperature and the temperature and humidity around the duct. Confirm the routes above exposed product and the project requirements for insulation, joints and condensate control.
What evidence should we request for an antimicrobial facing?
Ask for the exact facing and treatment tested, test method, organisms and test conditions. Request separate evidence for compatibility with the facility's cleaning agents if that is required.
Can process exhaust be included in the same quotation?
List it separately and send the engineer-approved construction and service conditions. We can then review which items fit our supply scope.
Can we start with a preliminary material schedule?
Yes. Mark provisional quantities and open specification items, and include the drawing revision. We can review panel and accessory quantities as the duct schedule develops.
Request a Ductwork Quotation
Tell us your facility type, project location, duct services and estimated quantities. Send drawings or the material schedule to inquiry@untduct.com with your project name.