Pre-Insulated Ductwork for Residential HVAC

Repeated apartment layouts, shallow villa ceilings and existing equipment connections affect what your team can fabricate and install. We supply aluminum-faced PIR and PU duct panels, joining profiles and fabrication tools. Share your residential drawings with us to review how the layout translates into a material schedule.

UNTDuct PIR duct section and aluminum-faced duct board

Plan Ductwork Around the Residential Layout

Multi-Unit Apartments

Start with the typical dwelling layout. Check where end units, mirrored plans or different shaft locations change the routing or fittings.

What to price · Panels, fittings and joints by unit type, plus a separate schedule for corridors and other shared areas.

Villas and Low-Rise Homes

Trace supply branches and ducted returns on the ceiling plan. Check the indoor unit connection, beam crossings and access above finished rooms.

What to price · Duct runs by floor or zone, with separate items for offsets, return connections and equipment transitions.

Occupied Home Retrofits

Survey retained ductwork and record the size of the opening through which new sections must pass. Mark the equipment and ductwork that will remain in service.

What to price · Replacement sections, tie-in adapters and joints required for the chosen installation sequence.

How to Count Ductwork for 24 Apartments

For a building with 18 standard apartments and six mirrored apartments, start with one ductwork takeoff per layout. Use those checked quantities to build the material schedule.

18 × Standard units

Multiply the checked per-unit quantities by 18.

6 × Mirrored units

Check the equipment outlet, branch locations and fitting orientation before multiplying by six.

+ Shared areas

Measure corridor and other common-area runs separately and add them once.

Order schedule: Keep the three quantities on separate lines and use the same unit and floor references as the drawings.

What Changes the Panel and Accessory Takeoff?

Project Condition What to Confirm What It Changes
Shallow ceiling void Outside duct dimensions, joint projection and available height at the tightest crossing. Joint placement, section breaks or a route review before fabrication.
Humid or unconditioned spaces Supply-air temperature and expected surrounding temperature and humidity. Insulation and joint details to review for condensation control.
Bedrooms and living areas Airflow requirements, available static pressure and the design team's acoustic criteria. Duct sizing and where the layout may need acoustic treatment.
Shafts and rated separations Which runs cross a rated wall or floor and what the design requires at the penetration. Where the design team must verify the assembly, penetration details and supporting documentation.

Match Panels and Accessories to the Duct Schedule

Use the project specification to confirm the panel construction for each duct service. Check the sheet dimensions and facing before nesting the cut pieces, then count joining components from the section breaks shown on the fabrication drawings.

UNTDuct pre-insulated PIR air duct board

PIR Air Duct Board

One listed configuration measures 3,950 × 1,200 × 20 mm, with a core density of 50–55 kg/m³. View PIR board specifications.

UNTDuct polyurethane composite duct panel

PU Composite Duct Panel

One listed configuration measures 3,950 × 1,200 × 20 mm, with a core density of 40–45 kg/m³. View PU panel specifications.

Review Your Residential Ductwork Takeoff

Send one representative unit layout and flag variations before multiplying quantities across floors. We can review the proposed panels and joining components and identify details needed for a quotation.

What to Include

Unit types, floors and quantities by building phase

Supply and return layouts with duct sizes and design pressures

Sections at beams, shafts and equipment connections

Specified panel construction and required documentation

Check the Joint and Equipment Connection Details

A duct schedule can show overall lengths without showing where each section ends. Mark those breaks on the fabrication drawing so the accessory schedule reflects the joints, terminal ends and transitions the installer will make.

UNTDuct invisible joining profile

Section-to-Section Joints

Record the joint type and panel thickness at each section break. Where an invisible profile is specified, check its dimensions against the selected panel and joint detail.

UNTDuct U-shaped duct profile

Terminal and Equipment Connections

Show the opening size, mating flange or adapter, panel edge detail and available assembly space. Confirm any U-profile and other accessories against that drawing before ordering.

Applying a joining profile to a UNTDuct pre-insulated duct section

Decide What to Fabricate Before Delivery

In a low-ceiling apartment retrofit, check the clearance beneath the beam using the outside duct size, joint projection and support space. Measure the access opening and the turns along the delivery route before fixing the section lengths.

If a full section cannot reach the ceiling void, compare shorter shop-fabricated sections with on-site assembly. Add the resulting joints and transitions to the takeoff, and identify which cuts, folds or connections your crew will make on site.

See the UNTDuct fabrication steps.

Specify Materials for Each Building Phase

We produce pre-insulated duct panels and extrude PVC profiles. For phased orders, identify the panel construction and joining profiles used in each release so your team can reconcile quantities with the drawing revision and track any changes between phases.

See our panel and profile production equipment.

UNTDuct PVC profile extrusion equipment

Residential HVAC Ductwork FAQs

Can I take off mirrored apartment layouts together?

Check the orientation of the indoor unit connections, branches and fittings first. Where the geometry changes, list the affected fittings and profiles against the mirrored unit type.

Should apartment and common-area ductwork be quoted together?

They can be included in the same request. Send separate quantities for dwellings and common areas so we can review any differences in specifications and quote the scopes separately.

Can I use the same panel construction for supply and return air?

Check the approved requirements for each run. Supply and ducted return can differ in pressure, insulation and documentation requirements.

What information is needed for ductwork above a humid ceiling void?

Send the expected air temperature inside the duct and the temperature and humidity around it. The design team can use those conditions to assess insulation and joint details for condensation control.

How do I specify a connection to an existing indoor unit?

Send a dimensioned sketch and photos of the outlet or return opening. Include the available working space and flange or adapter details if known.

How do I allow for joints when sections are assembled on site?

Mark the intended section breaks on the drawing and count both intermediate joints and equipment connections. Include the operations your crew will perform on site when listing tools.

What should I send before the quantities are final?

Send the latest drawings, representative unit types and estimated quantities by phase. Mark provisional items and include any specified panel, joint and documentation requirements.

What should be listed separately when a duct crosses a rated separation?

Identify the duct run and penetration on the drawing and list the documentation required for the proposed assembly and penetration detail.

Request a Residential HVAC Ductwork Quote

Tell us the building type, project location, duct scope and estimated quantities. For layouts, sections or connection photos, email inquiry@untduct.com and include the same project name in your message and email.

 
Contact us if have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!