PIR Pre-insulated HVAC Duct Board

PIR Pre-insulated HVAC Duct Board

Details
PIR (Polyisocyanurate) Pre-insulated HVAC Duct Board is emerging as a superior alternative to traditional galvanized iron (GI) ducting with external insulation.
Category
UNTDuct PIR System
 
Send Inquiry
Description
Technical Parameters

Thanks to its excellent products and quality services, UNT Duct is one of the leading pir pre-insulated hvac duct board manufacturers and suppliers in China. Welcome to buy the high quality and customized products from our factory. We will offer you the best service and fast delivery.

 

PIR Pre-insulated HVAC Duct Board

 

As Australia continues to face rising energy costs, stricter building codes (NCC 2022), and a growing focus on sustainability, HVAC professionals and builders are demanding more efficient, durable, and compliant ductwork solutions. PIR (Polyisocyanurate) Pre-insulated HVAC Duct Board is emerging as a superior alternative to traditional galvanized iron (GI) ducting with external insulation.

 

What is PIR Pre-insulated Duct Board?

PIR duct board is a rigid, lightweight composite panel consisting of:

Core: High-density closed-cell PIR foam – inherently fire-resistant and offering exceptional thermal performance.

Facings: Both sides are bonded with aluminum foil (typically 60 or 80 microns thick), providing a vapor barrier, structural strength, and a cleanable interior surface.

Unlike traditional ductwork (metal + fiberglass/rubber insulation), the insulation is integral to the panel, ensuring consistent performance without gaps or compression.

Send inquiry

PIR Pre-insulated HVAC Duct Board

Key Benefits 

of PIR Pre-insulated HVAC Duct Board for Australian Projects

 

 

1. Superior Thermal Efficiency (High R-Value)

Australia's diverse climate – from humid QLD summers to cold VIC/ACT winters – demands high-performance insulation.

R-Value: PIR offers approximately R1 per 20mm thickness. This significantly outperforms fiberglass or EPS of the same thickness.

Result: Lower heat gain/loss, reduced HVAC runtime, and lower electricity bills – crucial for NABERS and Green Star ratings.

 

2. Compliant with Australian Standards

AS 4254 (Ductwork for air-handling systems in buildings): PIR duct board systems are fully compliant when installed with approved jointing methods.

AS 1530.1 & AS/NZS 3837 (Fire properties): PIR has a low flame spread, low smoke development, and can achieve a Group 1 or 2 fire index. Unlike standard polystyrene, PIR chars without dripping burning droplets.

AS 4859.1 (Thermal insulation materials): Meets requirements for R-value and durability.

 

3. Outstanding Fire Performance for Building Safety

Following major building reform post-Grenfell and Australian cladding bans, fire safety is paramount.

PIR has an auto-ignition temperature > 400°C.

Naturally flame-resistant (no added halogens required).

 

4. Indoor Air Quality & Mold Prevention

The closed-cell core does not absorb moisture. The aluminum facings create a complete vapor barrier, preventing condensation and mold growth inside duct walls.

Smooth interior foil surface resists dust accumulation and is easy to clean, supporting good IAQ – especially important for healthcare and food processing facilities.

 

5. Lightweight & Faster Installation

PIR board weighs approx. 1.4–2.5 kg/m² (for 25mm board), compared to 4–8 kg/m² for metal + external insulation.

No heavy lifting, no external insulation wrapping, no welding required.

Cuts and fabricates with simple hand tools or grooving machines.

Reduces structural support requirements and installation time by up to 50%.

 

6. Excellent Acoustics

The PIR core absorbs vibration and reduces airborne noise (fan noise) and structure-borne noise (rumbling).

Typical sound attenuation: >25dB per meter, eliminating the need for external acoustic lagging in many applications.

Send inquiry

certification of PIR Pre-insulated HVAC Duct Board
 
 

Fire Safety, Thermal Conductivity and Physical Performance

UNTDuct PIR Fire Safety BS476 Part 6&7

BS 476 Part 6&7

PIR Fire Safety ASNZS 1530.3

ASNZS 1530.3

Thermal Conductivity Thermal Resistance of PU Pre-insulated Aluminum Duct

thermal Conductivity

Physical Property of Pre-insulated Duct

Compress Strength

CFC HCFC Free

CFC HCFC Free

Send inquiry

Why choose UNTDuct

UNT Pre-insulated Ductwork

What is UNT Duct System

UNT Duct System

 

Specification

Item

Unit

Specification

Standard Panel Size

mm

3950x1200x20

Alu. Foil Thickness

mm

0.06 or 0.08

PIR Foam Density

kg/m³

50-55

Fire Safety (BS476Part 6&7)

 

Class 0

Thermal Conductivity

W/(m·K)

0.020

Compressive Strength

MPa

0.2

Bending Strength

MPa

2

Water Absorption

%

0.36

Dimension Change

%

0.3

Working Temperature

℃

-60 to +80

Max Pressure in duct

Pa

1500

Maximum Allowable Wind Velocity

m/s

≤15

Max Continuous Running Temperature

℃

≤70

Lifespan of PIR Air Duct

years

>20

PRE-INSULATED DUCT vs G.I. DUCTWORK

Metric

20mm PIR Pre - Insulated Duct
(with 0.08mm Alu. Foil, )

0.5mm G.I Duct + 30mm Rubber Plastic (40-90kg/m3)

Fire Safety

Compliant (Class 0/BS 476, AS 1530.3). Self-extinguishing PIR core, low toxic smoke, non-combustible alu foil.

G.I non-combustible;
rubber plastic fire-retardant but requires coating to meet strict codes.G.I

Thermal Insulation

Excellent.
λ=0.020 W/m·K, no thermal bridging. 20mm integrated structure ensures consistent insulation.

Fair.
λ=0.035 W/m·K, thermal bridging at G.I joints. 30mm insulation offset by metal conductivity.

Hygiene & Air Quality

Superior.
Non-porous alu foil, smooth inner surface, moisture-resistant PIR. Meets cleanroom/hospital standards.

Poor.
Porous rubber plastic traps dust/mold; G.I-insulation gaps breed pathogens.

Lightweight

1.4-1.5 kg/m².
Ultra-light, reduces structural load; ideal for retrofits/timber-framed buildings.

5.1–6.3 kg/m².
Heavy G.I base + bulk insulation; requires reinforced supports.

Energy Efficiency

Excellent.
20–30% lower HVAC energy consumption. Minimizes heat gain/loss in conditioned air.

Low.
20–30% higher energy loss due to inferior insulation and thermal bridging.

Ease of Construction

Easy.
Factory-prefabricated tongue-and-groove joints. No separate insulation step; 40–60% less labor time.

Complex.
Two-step on-site process: G.I duct fabrication + rubber plastic wrapping. Labor-intensive, prone to gaps.

Quiet Operation

Good.
PIR core absorbs 10–15 dB airflow noise; alu foil dampens vibration.

Fair.
Rubber plastic provides basic sound reduction, but G.I vibration and insulation gaps reduce efficiency.

Space Savings

Excellent.
20mm total thickness (all-in-one). Fits tight ceilings/retrofit cavities.

Poor.
30.5mm total thickness (0.5mm G.I + 30mm insulation). Bulky, requires larger installation space.

Environmental Friendliness

Balanced.
CFC/HCFC-free PIR, recyclable alu foil. 20–30-year lifespan; net carbon positive in 1–3 years.

Low.
Rubber plastic non-recyclable; 10–15-year lifespan. Frequent replacement increases waste; higher energy emissions.

Air Leakage

Superior.
≤2% air leakage (EN 1507, AS/NZS 3660.1). Airtight factory joints + alu foil vapor barrier.

Poor.
5–10% air leakage. On-site sealing gaps; separate vapor barrier required.

Performance comparison based on UNT Duct product data and standard system configurations. Actual performance may vary depending on system design, installation method and project conditions.

Contact now

Hot Tags: pir pre-insulated hvac duct board, China, suppliers, manufacturers, factory, customized

Send Inquiry
Contact us if have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!