PU Air Conditioning Ductwork

PU Air Conditioning Ductwork

Details
PU Air Conditioning Ductwork is a high-performance, all-in-one solution designed for modern heating, ventilation, and air conditioning (HVAC) systems.
Category
UNTDuct PU System
 
Send Inquiry
Description
Technical Parameters

Thanks to its excellent products and quality services, UNT Duct is one of the leading pu air conditioning ductwork manufacturers and suppliers in China. Welcome to buy the high quality and customized products from our factory. We will offer you the best service and fast delivery.

 

PU Air Conditioning Ductwork

PU Air Conditioning Ductwork, also referred to as PU aluminum foil duct board or PU sandwich air duct panel, is a high-performance composite material specially engineered for HVAC heating, ventilation and air conditioning ductwork systems.

The panel features a three-layer bonded composite structure:

Two outer faces: Heavy-duty aluminum foil, available in smooth or embossed finishes

Central core: Rigid polyurethane (PU) foam, serving simultaneously as structural reinforcement and thermal insulation.

 

Structure: Silver Aluminum/ PU Foam/ Silver Aluminum
Size: 3950*1200*20mm
Foam Density: 50kg/m3
Aluminum Thickness: 0.06mm or 0.08mm
Aluminum Color: Silver
Packing: 10 sheets/ package
Loading Capacity: 710 sheets/ 40'HQ (packed with plastic bags)
                                660 sheets/ 40'HQ (packed with cardboard box)

 

Send Inquiry

 

Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel

Economic efficiency throughout the entire life cycle of PU Air Conditioning Ductwork

Class 0 Duct Panel

By using the third-generation modified MDI raw material, the service life of the board is extended to over 30 years, which is 2 to 3 times that of ordinary insulation materials. Meanwhile, its recyclability has broken through the industry bottleneck - after being crushed and reshaped, the waste boards can still maintain over 85% of their original performance.

 

 

Take industrial plants as an example. The comprehensive cost throughout their entire life cycle can be reduced by 28% compared to traditional insulation solutions.

Send Inquiry

Integrated structural and thermal insulation solution of UNT PU Air Conditioning Ductwork

Breaking through the single positioning of "only used as an insulation layer", the board itself has a compressive strength of over 2.5MPa and can be directly used as a lightweight load-bearing structure.

 

 

In the construction of cold chain logistics vehicles, there is no need for additional steel structure supports. Just by joining the panels, both insulation (with a temperature difference maintenance capacity of up to 48 hours) and structural load-bearing (capable of bearing 300kg per square meter) requirements can be met simultaneously, shortening the overall construction period by 40%. ​

Send Inquiry

Class 0 Ducting

Main Production Process of PU Air Conditioning Ductwork

product-496-372
1. Raw Material Mixing
product-496-372
2. Aluminum foil embossing
product-496-372
3. PU Foam Injection
product-496-372
4. Foaming & Laminating
product-496-372
5. Pre-insulated Panel Cutting
product-496-372
6. Duct Panel auto-stacking
product-496-372
7. Packing of Pre-insulated duct
product-496-372
8. Stocking of PID panel

Why choose UNTDuct

UNT Pre-insulated Ductwork

What is UNTDuct System

UNT Duct System

 

PRE-INSULATED DUCT vs G.I. DUCTWORK

Metric

20mm PU Pre - Insulated Duct
(with 0.08mm Alu. Foil, )

0.5mm G.I Duct + 30mm Rubber Plastic (40-90kg/m3)

Fire Safety

Compliant (Class 0/BS 476, AS 1530.3). Self-extinguishing PU core, low toxic smoke, non-combustible alu foil.

G.I non-combustible;
rubber plastic fire-retardant but requires coating to meet strict codes.G.I

Thermal Insulation

Excellent.
λ=0.020 W/m·K, no thermal bridging. 20mm integrated structure ensures consistent insulation.

Fair.
λ=0.035 W/m·K, thermal bridging at G.I joints. 30mm insulation offset by metal conductivity.

Hygiene & Air Quality

Superior.
Non-porous alu foil, smooth inner surface, moisture-resistant PU. Meets cleanroom/hospital standards.

Poor.
Porous rubber plastic traps dust/mold; G.I-insulation gaps breed pathogens.

Lightweight

1.4-1.5 kg/m².
Ultra-light, reduces structural load; ideal for retrofits/timber-framed buildings.

5.1–6.3 kg/m².
Heavy G.I base + bulk insulation; requires reinforced supports.

Energy Efficiency

Excellent.
20–30% lower HVAC energy consumption. Minimizes heat gain/loss in conditioned air.

Low.
20–30% higher energy loss due to inferior insulation and thermal bridging.

Ease of Construction

Easy.
Factory-prefabricated tongue-and-groove joints. No separate insulation step; 40–60% less labor time.

Complex.
Two-step on-site process: G.I duct fabrication + rubber plastic wrapping. Labor-intensive, prone to gaps.

Quiet Operation

Good.
PU core absorbs 10–15 dB airflow noise; alu foil dampens vibration.

Fair.
Rubber plastic provides basic sound reduction, but G.I vibration and insulation gaps reduce efficiency.

Space Savings

Excellent.
20mm total thickness (all-in-one). Fits tight ceilings/retrofit cavities.

Poor.
30.5mm total thickness (0.5mm G.I + 30mm insulation). Bulky, requires larger installation space.

Environmental Friendliness

Balanced.
CFC/HCFC-free PU, recyclable alu foil. 20–30-year lifespan; net carbon positive in 1–3 years.

Low.
Rubber plastic non-recyclable; 10–15-year lifespan. Frequent replacement increases waste; higher energy emissions.

Air Leakage

Superior.
≤2% air leakage (EN 1507, AS/NZS 3660.1). Airtight factory joints + alu foil vapor barrier.

Poor.
5–10% air leakage. On-site sealing gaps; separate vapor barrier required.

   
Performance comparison based on UNT Duct product data and standard system configurations. Actual performance may vary depending on system design, installation method and project conditions.    

How To Make PU Pre-insulated Straight Duct

Step 1 - Tracing: outline the duct shapes on the panel.

 

Step 2 - Cutting: Using manual cutting tools, cut along the panel edges and create 90 degree "V" grooves on the panel.

 

Step 3 - Gluing: Apply glue to the cutting surfaces of the panels.

 

Step 4 - Folding: After the glue is cured, fold the sides toward each other to form the straight duct.

 

Step 5 - Taping: The tape is applied only to the external seams of the duct where the sides of the panel were joined for air-tightness.

 

Step 6 - Flanging: After applying glue and positioning the steel angle bracket, process to fit the PVC or aluminum invisible flanges.

 

Step 7 - Reinforcement: reinforce the duct with an aluminum reinforcement bar and G.I. Shaped disks, if necessary.

 

Step 8 - Sealing: After the duct is assembled, seal all internal joints hermetically with silicone.

 

Need the complete fabrication solution?
UNT Duct supplies PU duct panels, fabrication tools, jointing accessories, reinforcement components and related materials for complete pre-insulated duct fabrication.

PIR pre-insulated ductwork

Contact now

Hot Tags: pu air conditioning ductwork, China, suppliers, manufacturers, factory, customized

Send Inquiry
Contact us if have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!