
Raw material preparation:
The main raw materials include polyurethane (PU) insulation foam and facing materials such as aluminum foil or aluminum sheets. High-quality polyurethane raw materials are selected and mixed with appropriate additives to achieve the desired properties, such as low thermal conductivity, high compressive strength, and good fire resistance. The facing materials should have good corrosion resistance, moisture resistance, and surface flatness.
Foaming process:
The prepared polyurethane raw materials are foamed through a chemical reaction. This can be done using various methods, such as the injection - molding foaming process or the continuous - slab foaming process. In the injection - molding foaming process, the raw materials are injected into a mold and allowed to foam and cure to form the desired shape and size of the PU insulation foam. The continuous - slab foaming process is used to produce large - scale PU foam slabs, which are then cut into smaller pieces for further processing.
Lamination of facing materials:
After the PU foam is formed, the facing materials are laminated onto both sides of the foam. This can be achieved through adhesive bonding or thermal lamination. In adhesive bonding, a suitable adhesive is applied to the surface of the PU foam and the facing material, and then the two are pressed together to form a strong bond. Thermal lamination involves heating the facing material and the PU foam to a certain temperature and then pressing them together under pressure to achieve lamination.
Cutting and shaping:
The laminated PU pre - insulated duct panels are cut into the required sizes and shapes according to the specific requirements of the duct system. This is usually done using cutting machines such as CNC cutting machines or circular saws. The cutting accuracy should be controlled to ensure that the panels can be assembled correctly.
Edge treatment:
The edges of the cut panels may be treated to improve their appearance and performance. This can include processes such as chamfering, rounding, or sealing the edges to prevent moisture ingress and improve the overall quality of the panel.
Quality inspection:
A series of quality inspections are carried out on the manufactured PU pre - insulated duct panels to ensure that they meet the relevant standards and requirements. This includes inspections of the dimensions, density, thermal conductivity, compressive strength, and fire resistance of the panels. Any panels that do not meet the quality standards are rejected and recycled or reworked.
Packaging and storage:
The qualified PU pre - insulated duct panels are packaged carefully to prevent damage during transportation and storage. They are usually packed in plastic film or cartons and stored in a dry and ventilated place to avoid moisture and sunlight exposure.
