I. Advantages of PIR Pre Insulated Ductwork Panels

WF International Mall adopts a steel core-tube structure. During HVAC duct construction, the ducting system required installation beneath and through steel beams. PIR Foam Ducting proved ideal due to its material properties:
1. Smooth, flat surfaces facilitate easy threading through narrow prefabricated beam spaces.
2. Lightweight structure is suitable for installation in steel-framed buildings.
3. Fast production and installation reduce project timelines significantly.
4. Superior mechanical strength and performance thanks to specialized manufacturing and flange connection methods.
5. Extremely low air leakage and thermal conductivity.
6. Hygienic, easy to clean, and made with eco-friendly materials free from formaldehyde emissions.
II. UNT PIR Pre Insulated Ductwork Panels Installation Steps
2. Duct-to-valve/equipment connections: Use high-strength H-profile connectors made from PVC or aluminum alloy. Apply flexible sealing gaskets and align connectors tightly with no distortion. Bolt spacing should not exceed 100 mm; all four corners must be bolted.
3. Duct-to-diffuser connections: Use adhesive-mounted H-connectors or self-tapping screws to secure F or h-type joints.
4. Branch duct connections: On large side branches, open a cut on the main duct and bond the branch directly or use a UPVC connector. Seal joints internally with silicone and externally with aluminum tape. Ensure cut edges are curved or sloped to reduce airflow resistance.
5. Sealing for medium/high-pressure systems: Use additional gaskets or other sealing techniques between flanges.

III. Installation Process for PIR Pre Insulated Ductwork Panels